The site contractor finished the ponds and installed the stone around the drain outlets.
The area where the pavilion is to be made has had the poor soils beneath it cut out and relocated. It is ready for engineered fill to be brought in an placed in lifts up to grade.
- Posted using BlogPress from my iPad
No comments:
Post a Comment