We started pouring the footings this afternoon. We were able to place the steel in the entire left side of the exterior footings and inspect it. We then subsequently poured this side.

The footings were inspected by the city, the steel was inspected by the architect and the site testing company, and the footing bearing capacity was tested by the site testing agency.