Slab prep day 1

Slab prep day 1 included grades brought back to the right elevation. Termite treatment sprayed, gravel an vapor barrier started.




Gravel going down 4" everywhere (the interior footings sit 2" above surrounding grade so it looks like less than 4" of gravel, but it is not).




Gravel does not overlap interior footings.




Gravel compacted with plate tamp, and hand tamp around plumbing lines.




Well tamped gravel. Interior footings were later cleaned up after the installation of the vapor barrier.