Most lumber arrived today.
Lumber.
Font poured.
Font poured.
Water stop installed.
Water stop used.
Brick ledge for back wall at font (required since footing is 4' deep)
Font poured.
Font after forms are stripped.
Grease trap reinstalled to proper elevation.
No comments:
Post a Comment