Tuesday, October 4, 2011

Busy Day with Multiple Trades on Site

Today was a busy and eventful day with many trades working at once. We had the concrete crew, plumber, electrician, and site contractor working.

The concrete crew was able to pour one of the last sections of stem walls in the morning, and then strip the walls and form the font and remaining walls.

The plumber started today, installing a lot of what is required including bathroom 107, and the main 4" line running perpendicular through the building.

The electrician installed conduit in the forms, and added grounding for the font handrails.

The site contractor received RCP and readied the job for additional dirt and his upcoming work.




Pouring the walls this morning.



Finishing the top of the stem walls.



Insulation on inside of stem walls installed on previously poured walls.



Font being formed.




Grounding added for all 4 font hand rails.



Forms stripped from walls poured this morning.




Plumbing drain lines being installed under slab.




Font overflow and wall clean outs inside font forming.





Drain lines for bathrooms done in the shop and dropped off ready to be installed.




4" drain line running through the building.