The mammoth 16" water line was tapped and back flow preventers set. The site utility contractor is now running the fire and domestic water lines to the building.
Tapping sleeve being installed.
Back flow preventers installed and 8" fire line and 2" copper water line laid out for install. Both are more than 48" deep.
No comments:
Post a Comment