The anchor bolts for the hold downs are mostly installed. They were drilled 14" deep, sucked out with a vacuum, blown out with air and then epoxied and set.

Hole drilled and cleaned out.

18" threaded rod ordered from local supplier pre cut.

14" embedment.

Final product.

Pulled out to show epoxy depth.
No comments:
Post a Comment