The first bit of topping going over the base.
All done, except the dot entrance.
My family talking a tour of the new parking lot.
Checked many areas with water to ensure that everything drained.
Over 8" at the DOT right of way.
All adjacent surfaces were properly tacked.
The second of three lifts at the entrance.
The machine that was "too close" to the road. Although it is hard to tell from the picture, the machine was over 4' from the road. They parked it there so that nobody would enter onto the new asphalt.
All done.